1/3/2024 0 Comments Nsd trackingCleanup work – removal of underground storage tanks, hydraulic hoists and all associated underground piping followed by excavation and disposal of contaminated soils.All the changes in the NSD file archive shall be versioned, tracked and inventoried in the. Just Enter NSD Non Stop Delivery Tracking number to track and trace your Courier, Parcel, Shipment and Get Real time delivery status information online. Building demolition – to allow for access to the contaminated soils located beneath the building foundations. A.3 CSAR with the YANG NSD without ta directory.Groundwater at the sites was then monitored quarterly, by sampling newly installed monitoring wells for a one-year period following the cleanup.Ĭontract plans and technical specifications were developed in order for a contractor to perform the cleanup work. The excavations were then treated with slurry to remediate the remnant soils and groundwater, followed by backfill with clean material. ![]() The site had contamination in soils and groundwater from leaking hydraulic hoists in the maintenance shop, as well as from underground fuel storage tanks in the active fueling area located in the bus barn, and abandoned fuel tanks possibly located in the parking area.Ĭleanup work consisted of excavating petroleum-contaminated soils and transporting them for disposal at a licensed facility that handles hazardous materials. ![]() This site was located in the northern portion of Bothell downtown, in the area formerly occupied by the Northshore School District’s (NSD) Transportation Facility and Bus Maintenance Shop.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |